GENERAL AND SAFETY CONDITIONS
GD shall ensure that all GD personnel will adhere to Safety Rules and loss Prevention Procedures as outlined in GD Handbook and Safety Guidelines, which was issued to Safety Officers and Site Supervisors by the GD Safety Dept. For an additional copy contact the GD Safety Department Representative.
  • GD shall be responsible for the safety of his personnel on the Jobsite and shall ensure proper safety equipment is worn. (As per GD Safety Handbook).
  • GD shall be responsible for obtaining at his own expense, all clearance documents, including but without limitations: Personnel I.D. Cards, vehicle clearance documents, gate passes, work permits etc. (As per explained in GD Safety Handbook).
  • It shall be G.Ds responsibility to visit the jobsite and verify all information regarding site conditions, accessibility, adjoining structures and dimensional accuracy of all drawings prior to submitting his bid and or starting a job.
  • GD shall indicate and identify the person who will be on site at all times in a supervisor capacity and is authorized to receive a Contractor Work Permit.
  • GD shall be responsible for keeping the work area in a clean condition. All trash, rags, paper and other discarded materials are to be picked up and placed in designated containers for removal.
  • All solid and liquid waste should be disposed in the appropriate disposal locations designated by the Main Contractor.
  • Engineer at Maintenance Bldg., to provide manpower list daily of personnel working at project site. This list to be submitted must accurately reflects the names and badge numbers of personnel working in project site on specific day.
  • Hot food will not be allowed into project site due to difficulties in inspecting contents. The food container and contents must be inspectable. GD personnel are not allowed to leave their jobsite without reason and wander around in the project area, nor sleep within the project site area.

  • The GD supervisor will be issued yellow cards for each employee along with the permit daily.
  • The yellow cards will indicate the job site/area of work within project location.
  • The cards have to be surrendered to Operations when closing the work permit each day.